GSI Pre-Fab Assembly

Pre-Fab Assembly by Mid-Western MillWright

Engineering and Construction

Midwestern Millwright engineered the tower from existing plans, and designed the integration with the assembly. Then we deployed this design onto the grain bin construction we’d already performed.